This is default featured slide 1 title

Go to Blogger edit html and find these sentences.Now replace these sentences with your own descriptions.

This is default featured slide 2 title

Go to Blogger edit html and find these sentences.Now replace these sentences with your own descriptions.

This is default featured slide 3 title

Go to Blogger edit html and find these sentences.Now replace these sentences with your own descriptions.

This is default featured slide 4 title

Go to Blogger edit html and find these sentences.Now replace these sentences with your own descriptions.

This is default featured slide 5 title

Go to Blogger edit html and find these sentences.Now replace these sentences with your own descriptions.

Tuesday, 20 March 2018

Contoh Daftar Isi (Skripsi)


DAFTAR ISI

HALAMAN JUDUL............................................................................................... i          
HALAMAN PENGESAHAN............................................................................ .... ii
HALAMAN MOTTO.............................................................................................. iii
HALAMAN PERSEMBAHAN............................................................................. iv
KATA PENGANTAR....................................................................................... .... v
DAFTAR ISI............................................................................................................ vii
DAFTAR TABEL................................................................................................... ix
DAFTAR GAMBAR.............................................................................................. x
DAFTAR LAMPIRAN........................................................................................... xi
INTISARI................................................................................................................. xii
BAB I        PENDAHULUAN
            A.       Latar Belakang ....................................................................................... 1
B.       Rumusan Masalah................................................................................... 2
C.       Tujuan Penelitian..................................................................................... 2
D.       Manfaat Penelitian.................................................................................. 2
E.        Batasan Masalah................................................................................. .... 2
F.        Keaslian Penelitian…………………………………………………...... 3
BAB II       TINJAUAN PUSTAKA
A.     ............................................................................................................................ 4
B.       ................................................................................................................... 5
C.       ................................................................................................................... 6
BAB III     METODE PENELITIAN
A.       Bahan...................................................................................................... 18
B.       Alat......................................................................................................... 18
C.       Pelaksanaan Penelitian............................................................................ 19
D.       Analisis Hasil.......................................................................................... 24
BAB IV     HASIL DAN PEMBAHASAN
A.       Hasil Pemeriksaan................................................................................... 25
B.       Hasil Pemeriksaan .................................................................................. 26
C.       Hubungan ................................................................................................ 27
D.       Pembahasan............................................................................................. 29
BAB V       KESIMPULAN DAN SARAN
A.       Kesimpulan............................................................................................. 32
B.       Saran....................................................................................................... 32
DAFTAR PUSAKA
LAMPIRAN

Contok Kata Pengantar (Skripsi)


KATA PENGANTAR


Puji Syukur kami panjatkan kehadirat Allah SWT yang telah melimpahkan rahmat dan hidayah-Nya, sehingga penyusun dapat melaksanakan tugas akhir dan menyusun laporan tugas akhir. Sholawat serta salam kami ucapkan kepada Nabi Muhammad SAW, keluarga serta sahabat–sahabatnya yang telah membawa kita dari zaman kebodohan menuju alam yang penuh ilmu pengetahuan seperti sekarang ini.
Penulisan laporan tugas akhir ini dimaksudkan untuk memenuhi persyaratan kurikulum guna menyelesaikan studi Strata 1 pada jurusan Teknik Sipil Fakultas Teknik Universitas .............................
Selama melaksanakan tugas akhir, maupun dalam menyelesaikan laporan penyusun banyak menerima kritik dan saran, dukungan dan bimbingan serta petunjuk-petunjuk yang senantiasa sangat bermanfaat tak lupa saya ucapkan banyak terima kasih kepada :
1.        Ibu ................M.T. selaku Ketua Jurusan Teknik Sipil Universitas .................................................
2.    Bapak .................. S.T., M.T. selaku Dosen Pembimbing I  yang telah memberikan pengarahan dan bimbingan serta petunjuk dan koreksi yang sangat berharga bagi laporan Tugas Akhir ini.
3.        Bapak ............................... S.T., M.T., Ph.D selaku Dosen Pembimbing II yang telah memberikan bimbingan dan pengarahan selama pelaksanaan dan penulisan tugas akhir ini.
4.        Bapak ..................... S.T., M.T., Ph.D. selaku Dosen Penguji yang telah memberikan koreksi pada laporan tugas akhir ini.
5. Bapak, Ibu Dosen Pengajar Jurusan Teknik Sipil Fakultas Teknik Universitas ........................................ atas ilmu yang telah diberikan kepada penyusun, semoga dapat bermanfaat.
6.        Seluruh Staff Tata Usaha Jurusan Teknik Sipil Universitas ............................................
7.   Kedua orang tua tercinta yang selalu memberikan doa,dukungan, pengarahan dan motivasi sehingga saya bisa menyelesaikan tugas akhir ini.
8.        Kepada rekan-rekan mahasiswa Teknik Sipil 2018 yang tidak dapat saya sebutkan satu persatu.
9.        Kepada semua pihak yang terlibat dalam penyusunan Tugas Akhir ini yang tidak dapat penyusun ungkapkan satu persatu, terimakasih atas bantuan, dukungan dan doanya.

Penyusun berharap seomga amal baik yang telah diberikan mendapat balasan dari Allah SWT. Disadari bahwa dalam penyusunan Tugas Akhir ini masih banyak kekurangan dan jauh dari sempurna, sehingga masih perlu adanya perbaikan dan saran dari pembaca. Penyusun juga berharap semoga Tugas Akhir ini dapat memberi manfaat bagi kita semua, Amin Ya Robbal ‘Alamin.


Wonogiri,   Maret 2018



                           Penyusun


Perencanaan Sambungan Kayu

Macam Sambungan :

  • Sambungan Titik Buhul, yaitu sambungan untuk merangkai buhul / simpul struktur.
  • Sambungan Perpanjangan, yaitu sambungan yang dibutuhkan untuk mendapatkan panjang kayu yang sesuai dengan kebutuhan yang direncanakan.


Tiga hal pokok yang harus diketahui tentang sambungan pada struktur kayu :

1.Macam dan jenis alat penyambung.
                2.Besaran dan arah gaya dari elemen batang yang disambung.
                3.Ukuran-ukuran dan jenis bahan dari elemen batang yang akan disambung. 

Macam-macam Alat Sambung Berdasarkan Jenisnya :
1.Sambungan Paku.
2.Sambungan Baut.
3.Sambungan Gigi.
4.Sambungan Perekat (Lem).
5.Sambungan Pasak (Pasak Kayu/Besi) 

Metode Pengelasan Pipa 24''

      Hal hal yang perlu di persiapkan sebelum pengelasan :
  1. Kawat Las
  2. Mesin
  3. Orangnya (Welder dan helper)
  4. Palu Track
Kawat las tidak boleh lembab, tidak boleh digeletakin di bawah, Kalo bisa di kasih sarung taruh di pinggang

ANALISA TIMBUNAN, PERATAAN DAN PEMADATAN SCR MASINAL, TANAH DARI SISA GALIAN

ANALISA TIMBUNAN, PERATAAN DAN PEMADATAN SCR MASINAL   
TANAH DARI SISA GALIAN   
   
           asumsi                  kode  koef satuan
 menggunakan alat berat   
 lokasi : area konstruksi   
 jam efektif per hari             Tk 7,0000 jam
 Faktor kembang-susut        Fk 1,2000
 Tebal hamparan padat         t 0,1500 M
   
urutan kerja   
 excavator memuat ke Dump Truck   
 Dump truck mengangkut ke lapangan dengan jarak  L  km
 Material dihampar dan diratakan dengan Dozer   
 Setiap lapisan 15cm, dilakukan pemadatan   
   
   
Bahan   
 Material timbunan = 1 x Fk (M08) 1,2000 M3
   
Alat   
1 Stamper   
    kecepatan rata2 alat         v 2,0 km/jam
    lebar efektif pemadatan   b 0,4000 M
    jumlah lintasan                n 6 lintasan
    faktor efisiensi alat          Fa 0,9000
   
 kapasitas Produksi / Jam v x 1000 x b x t x Fa Q4 = 18,0000 M3
  n 
   
 Koefisien Alat / M3 1 : Q4 (E19) 0,0556 jam
   
 Alat bantu   
 - Sekop   
 - Keranjang  Lumpsump 
 - Semprotan Air   
   
2 Tenaga   
    Produksi menentukan: whell loader       Q4 18,0000
    Prod Galian / hari = Tk x Q1                  Qt 126,0000
    Kebutuhan tenaga:   
  -Pekerja     P 4,0000 orang
  -Mandor    M 1,0000 orang
   
 Koefisien tenaga / M3   
  -Pekerja = (Tk x P) : Qt (L01) 0,2222
  -Mandor =(Tk x M) : Qt (L02) 0,0556
   

ANALISA TIMBUNAN, PERATAAN DAN PEMADATAN SCR MASINAL, TANAH DARI SISA GALIAN (SETEMPAT)

ANALISA TIMBUNAN, PERATAAN DAN PEMADATAN SCR MASINAL   
TANAH DARI SISA GALIAN (SETEMPAT)   
   
       asumsi                       kode koef satuan
 menggunakan alat berat   
 lokasi : area konstruksi   
 jam efektif per hari           Tk 7,0000 jam
 Faktor kembang-susut      Fk 1,2000
 Tebal hamparan padat       t 0,1500 M
   
urutan kerja   
 Material dihampar dan diratakan dengan Dozer   
 Setiap lapisan 15cm, dilakukan pemadatan  L 0,0000 km
   
   
   
   
Bahan   
 Material timbunan = 1 x Fk (M08) 1,2000 M3
   
Alat   
1 Dozer  (E09) 
    Panjang hamparan      = Lh 50,00 M
    Lebar blade                 = b 2,4000 M
    Faktor efisiensi alat    = Fa 0,9000
    Kecepatan rata2 alat   = v 5,0 km / jam
    Jumlah lintasan           = n 4 lintasan
 Waktu siklus   
 - Penghamparan 1 kali lintasan = Lh : (v x 1000) x 60 T1 0,6000 menit
 - Lain  T2 0,5000 menit
   Ts3 1,1000 menit
   
 Kapasitas Produksi /  Jam      Lh x b x t x Fa x 60 (Q3 = 220,9091 M3)
             n x Ts3 
   
 Koefisien Alat / M3                 1 : Q3 (E09) 0,0045 jam
   
   
2 Vibro Roller   
    kecepatan rata2 alat       = v 4,0 km/jam
    lebar efektif pemadatan = b 1,2000 M
    jumlah lintasan              = n 6 lintasan
    faktor efisiensi alat        = Fa 0,9000
   
 kapasitas Produksi / Jam          v x 1000 x b x t x Fa (Q4 = 108,0000 M3)
                 n 
   
 Koefisien Alat / M3                 1 : Q4 (E19) 0,0093 jam
   
 Alat bantu   
 - Sekop   
 - Keranjang  Lumpsump 
 - Semprotan Air   
   
3 Tenaga   
 Produksi menentukan: whell loader Q4 108,0000
 Prod Galian / hari = Tk x Q1           Qt 756,0000
 Kebutuhan tenaga:   
  -Pekerja P 4,0000 orang
  -Mandor M 1,0000 orang
   
 Koefisien tenaga / M3   
  -Pekerja = (Tk x P) : Qt (L01) 0,0370
  -Mandor =(Tk x M) : Qt (L02) 0,0093
   

ANALISA TIMBUNAN, PERATAAN DAN PEMADATAN SCR MASINAL, TANAH DARI SISA GALIAN (PENGAMBILAN 10-50m)

ANALISA TIMBUNAN, PERATAAN DAN PEMADATAN SCR MASINAL   
TANAH DARI SISA GALIAN (PENGAMBILAN 10-50m)   
   
      asumsi               kode koef satuan
 menggunakan alat berat   
 lokasi : area konstruksi   
 jam efektif per hari       Tk 7,0000 jam
 Faktor kembang-susut       Fk 1,2000
 Tebal hamparan padat        t 0,1500 M
   
urutan kerja   
 excavator memuat ke Dump Truck   
 Dump truck mengangkut ke lapangan dengan jarak  L 0,0500 km
 Material dihampar dan diratakan dengan Dozer   
 Setiap lapisan 15cm, dilakukan pemadatan   
   
   
Bahan   
 Material timbunan = 1 x Fk (M08) 1,2000 M3
   
Alat   
1 Whell loader  (E10) 
  kapasitas bucket       V 1,5000 M3
  Faktor Bucket          Fb 0,9000
  Faktor efisiensi alat  Fa 0,8300
   
 waktu siklus  Ts1 
 - menggali / memuat  T1 0,5000 menit
 - lain  T2 0,5000 menit
   Ts1 1,0000 menit
   
   
 kap.Prod / jam =  V x Fb x Fa x 60 Q1 56,0250 M3/jam
  Ts1 x Fk 
   
 Koefisien Alat / M3 = 1 : Q1 (E10) 0,0178 Jam

ANALISA TIMBUNAN, PERATAAN DAN PEMADATAN SCR MASINAL   
TANAH DARI SISA GALIAN (PENGAMBILAN 10-50m)   
2 Dump truck  (E08) 
  kapasitas bak           V 4,0000 M3
  Faktor efisiensi alat   Fa 0,8300
  Kecepatan rata2 muatan  v1 20,0000 km/jam
  kecepatan rata2 kosong  v2 30,0000 km/jam
   
 waktu siklus  Ts2 
 -waktu tempuh isi          ( L : v1) x 60 T1 0,1500 menit
 -waktu tempuh kosong   (L : v2) x 60 T2 0,1000 menit
 -muat                              (V : Q1) x 60 T3 4,2838 menit
 -lain2                                                    T4 1,0000 menit
                                                              Ts2 5,5338 menit
   
   
 kap Prod /  Jam =           V x Fa x 60     (Q2 =29,9975 M3 / Jam)
      Fk x Ts2 
   
 Koefisien Alat / M3 =     1 : Q2 (E08) 0,0333 jam
   
   
3 Dozer  (E09) 
  panjang hamparan        Lh 50,00 M
  Lebar blade                   b 2,4000 M
  Faktor efisiensi alat       Fa 0,9000
  Kecepatan rata2 alat      v 5,0 km / jam
  jumlah lintasan              n 4 lintasan
  Waktu siklus   
 - Penghamparan 1 kali lintasan = Lh : (v x 1000) x 60 T1 0,6000 menit
 - Lain                                                                             T2 0,5000 menit
                                                                                       Ts3 1,1000 menit
   
 Kapasitas Produksi /  Jam     Lh x b x t x Fa x 60    (Q3 = 220,9091 M3)
           n x Ts3 
   
 Koefisien Alat / M3                1 : Q3 (E09) 0,0045 jam
   
   
4 Vibro Roller   
 kecepatan rata2 alat          v 4,0 km/jam
 lebar efektif pemadatan    b 1,2000 M
 jumlah lintasan                 n 6 lintasan
 faktor efisiensi alat           Fa 0,9000
   
 kapasitas Produksi / Jam     v x 1000 x b x t x Fa       (Q4 = 108,0000 M3)
                n 
   
 Koefisien Alat / M3            1 : Q4 (E19) 0,0093 jam
   
 Alat bantu   
 - Sekop   
 - Keranjang  Lumpsump 
 - Semprotan Air   
   
4 Tenaga   
  Produksi menentukan: whell loader    Q4 108,0000
  Prod Galian / hari = Tk x Q1               Qt 756,0000
  Kebutuhan tenaga:   
  -Pekerja P 4,0000 orang
  -Mandor  M 1,0000 orang
   
 Koefisien tenaga / M3   
  -Pekerja  =(Tk x P) : Qt (L01) 0,0370
  -Mandor   =(Tk x M) : Qt (L02) 0,0093
   